Infrastructure works
Status
Completed
Project Type
Infrastructure Development
Project duration
10 march 2019 21june 2023
Price Range
435M

Project description
Buildicons Construction Services is proud to have played a key role in the infrastructure development of Bahria Town Karachi including excavation, sewerage, walkways, rain water drains & water supply systems, delivering high-quality civil engineering services to support this fast-growing urban community.
Our team executed a comprehensive scope of work that included deep excavation, sewerage system installation, pedestrian-friendly walkways, rainwater drainage systems, and a robust water supply network — all tailored to support long-term sustainability and functionality.
Challenges & Solutions
Urban infrastructure demands precision and foresight. In this project, we addressed:
Complex terrain and soil conditions with expert excavation planning
High groundwater levels managed with advanced dewatering techniques
Seamless utility integration while maintaining environmental compliance
Use of high-grade PVC and RCC piping systems for durability and efficiency
Key Details
- Location: Bahria Town Karach
- Category: Infrastructure Development
- Project Type: Excavation, Sewerage, Walkways, Rainwater Drains & Water Supply System
- Status: Completed
- Scope: Civil Works, Utility Installation, Site Development & Finishing
Features & amenities
Excavation
Excavation with modern machinery for site preparation
Earthworks
Earthworks with modern machinery for site preparation
Sewerage Pipeline
Underground sewerage pipeline installation with durable materials
Pedestrian paths
Pedestrian paths are designed for accessibility and safety
Walkways
Walkways are designed for accessibility and safety
drainage systems
Rainwater drainage systems to mitigate flooding and ensure proper flow
Water supply
Water supply systems integrated with pressure management
Concrete finishing
Concrete finishing, paving, and landscaping for a complete solution